The shop progresses 8/20/09

Progress on the new shop. The subfloor is in, exterior walls all framed. We are beefing up the trusses now (hurricanes!) and installing radiant barriers between the top chords of the trusses. We should enclose the entire shop tomorrow with plywood, but it is soooo hot inside with the walls enclosed that we are trying to figure out what else we could do before closing up. Drill for all the electrical wiring is about it, and that will only take a short time.